Escondida Copper Mine
1995
VSL sets a record for the heaviest structure ever lifted by designing the critical erection methods for the 4,200 t steel roof structure for the one of the world’s largest copper mines.
VSL sets a record for the heaviest structure ever lifted by designing the critical erection methods for the 4,200 t steel roof structure for the one of the world’s largest copper mines.