Post-Tensioning for Wind farms
Concrete reinforcement for stability and durability
Concrete wind towers are built taller and stronger to support larger rotors and capture more wind. Post-tensioning is a key structural reinforcement method that enhances stability and durability of concrete towers throughout their service life. VSL provides an external post-tensioning system developed specifically for wind towers, with European Technical Approval and field-proven performance for onshore and offshore sites.
Why post-tensioning for wind towers?
Post-tensioning reinforces the concrete shell. This support improves resistance to wind and operational loads throughout the tower’s service life.
Compression forces reduce cracking and long-term degradation. This helps maintain performance over time.
The system suits both land-based and offshore installations. It meets specific technical conditions for different sites.
The VSL external system is ETA-approved. This approval reflects compliance with stringent quality and safety standards.
Tendons can be re-stressed or released when required. This allows adjustment after initial installation for maintenance or performance needs.
VSL’s Post-Tensioning Services
VSL provides a complete post-tensioning offering tailored to wind tower projects. Our approach supports structural design, supply, installation and logistic coordination on site.
Technical support for post-tensioning design integration
Supply of external multi-strand vertical tendons
Installation supervision and quality control
Coordination with tower construction activities
Support for re-stressing requirements when needed
Why Choose VSL for Post-Tensioning
Post-tensioning expertise
VSL has deep experience in designing and applying post-tensioning systems across major structures worldwide.Proprietary technology
The external system for wind towers is developed by VSL and optimized for site use.Compliance and performance
The system holds European Technical Approval, supporting reliable long-term structural behavior.Onshore and offshore capability
VSL adapts solutions to both land-based and offshore wind tower conditions.
FAQs about post-tensioning in wind farms
It is a reinforcement method that applies compressive forces to concrete towers using high-strength tendons. This supports structural behavior and durability
Yes. VSL’s external system for wind towers holds European Technical Approval.
Yes. Tendons can be re-stressed or released as needed during service life.