• LAP SAP WAN, CAPE D’AGUILAR, Hong Kong

Asia-Africa-Europe-1 Submarine Cable System

2017

VSL helped install a 350m-long submarine cable using horizontal directional drilling (HDD) in Hong Kong’s protected Lap Sap Wan Bay. Using this method greatly reduced the amount of surface disruption and highlighted the technique’s value in countless scenarios.