Aurach Bridge
2024
As part of the construction of a new bridge parallel to the one to be demolished, VSL Switzerland supplied and installed the post-tensioning system. VSL’s site team focussed on closely following the schedule set by the main contractor, so that there was no delay to the main operations such as pouring concrete and launching form travellers that were on the critical path.