Basohli cable-stayed bridge
2016
VSL supplied and installed its SSI 2000 stay cable system, including full-scale fatigue testing for the construction of the fourth cable-stayed bridge in India, a 592m-long structure that crosses the River Ravi between Pathankot and Basohli.