BIM 2 SOLAR FARM
2018 – 2019
VSL was appointed to carry out a third of the mechanical works for the BIM 2 solar farm, which has become the largest of its kind in Southeast Asia, with an expected production capacity of over 250MWp.
VSL was appointed to carry out a third of the mechanical works for the BIM 2 solar farm, which has become the largest of its kind in Southeast Asia, with an expected production capacity of over 250MWp.