• Heze, China
  • Wind farms
  • Post-Tensioning – Wind farms

China Resources Shandong Jauncheng Wind Farm

2020-2021

VSL was involved during the tower design stage and installed its E-WT external tendon system, which ensures reliable structural behaviour of the tower throughout its service life.