Comprehensive Repair of the Karolin Pipe Bridge in Poland
2024
Built in 1973, the Karolin Pipe Bridge carries four pipes that supply heat to a large population in Poznań. VSL Poland was hired to carry out a comprehensive repair programme, including structural reinforcement, corrosion prevention, concrete surface renovation, anticorrosion protection for the steel structure, and, most importantly, the replacement of deteriorated collars on the bridge hangers.