Construction of a cable-stayed bridge over the Kamienna River
2024
As part of the construction of a new cable-stayed bridge over the Kamienna River, VSL Poland was contracted to carry out a comprehensive scope of work, including supplying and installing the stay
cable system, the post-tensioning system and the stressing bars for the pylon connection, as well as anchoring the pylon to the pier foundations. A key challenge was the installation of forks as dead-end anchorages at the tower, a unique solution required by the bridge’s unconventional design. To meet these demands, VSL adapted its SSI 2000 Stay-Cable system, replacing standard anchorages with forks and customising the installation process.