• Koszalin, Poland
  • Bridges
  • Bearings – Bridges
  • Deck Construction – Bridges
  • Post-Tensioning – Bridges

Construction of S6 Koszalin Bypass

2024

VSL Poland played a key role in building a new bridge over a local road and railway as part of a motorway bypass project, employing specialist construction methods to deliver the most complex
parts of the project. VSL used incremental launching and balanced cantilever construction for a 360-metre-long section and a 390-metrelong section, including a 130-metre-long railway span respectively, the rest was built by the main contractor using conventional scaffolding systems. VSL Poland provided and operated lifting equipment, and also supplied temporary bearings, installed the post-tensioning system, and lifted the bridge to replace temporary bearings with permanent ones.