Cycle Pass Bridge
2020-2021
VSL was awarded a contract to perform rectification of panels on a newly built mechanically stabilised earth wall that did not meet the required tolerance. VSL developed an efficient method to safely replace the concrete panels, eliminating the need to dismantle the whole soil wall.