• Malacca, Malaysia
  • Industrial facilities
  • Slab-on-grade – Industrial facilities

Designing and Building a PT Slab for Koa Denko Factory

2024

VSL Malaysia was commissioned to design, supply, and construct post-tensioned slabs across four levels of Koa Denko Corporation’s new facility. The team ensured effective load transfer
after the slabs were cast and tensioned, while reducing materials, shortening cycle times, and minimising use of resources. Alongside design and consultation, VSL managed the full supply and installation of post-tensioning materials, ensuring efficiency and quality control. The optimised PT design also reduced rebar use and concrete thickness, lowering the carbon footprint.