DUBAI FRAME
2015
VSL lifted a 750t heavy viewing bridge connecting two 150m-high concrete cores for the giant rectangular Dubai Frame in Zaabeel Park, a tourist attraction offering a spectacular view of Dubai. The 75m-long steel bridge was assembled at ground level and then lifted by 132m into its final position using four strand jacking units, with one positioned at each corner of the structure, in a 13-hour operation.