Emosson Dam Reservoir
2011-2012
In order to regulate the quantity of water storage in the Emosson Dam Reservoir, VSL Heavy Lifting was awarded the contract, and installed two manifold concrete caissons, lowering them more than 100m into the lower lake, landing in their precise planned spots.