Flamanville EPR Nuclear Power Plant
2008-2009
For this project, temporary supporting wall were needed in order to separate the construction zones from the created terraces to enable work to take place safely in different areas of the site. The supporting walls were built using the VSoL® system.
The VSoL® retained earth wall system was chosen as it is economical, simple and quick to install. Furthermore, VSL provided a prefabrication of the system including steel lattices, as well as on-site technical assistance.