GREEN LINE MTR

2013 – 2015

VSL carried out post-tensioning works for a 12.6km long section, which is part of the extension of Bangkok’s MTR Green Line. VSL installed more than 3,350t of strands and was responsible for stressing and grouting, and the preparation of shop drawings and reports on the PT works.