HONG KONG TELECOMMUNICATIONS ULTRA EXPRESS CABLE LANDING
2019
VSL installed a 573m-long land-to-sea conduit and built a beach manhole using Horizontal Directional Drilling (HDD) as part of a project to lay down a fibre-optic cable for Hong Kong Telecommunications Ltd (HKT), one of the largest telecommunications companies in Hong Kong. HDD enabled the product pipe to be installed from land to sea with a punch-out on the seabed, without disturbing either the seawall with its 30m-deep foundations or the offshore coral.