KAI TAK MTR STATION
2018-2022
Ahead of construction of a building located directly above Kai Tak MTR station, VSL installed an Automatic Deformation Monitoring System (ADMS) across 300 m of the underground railway tunnel, under tightly-controlled access conditions. The real-time information was used to prevent any impact of above-ground site activity on the safe operation of the tunnels.