• KILMANY, Australia
  • Bridges
  • Bearings – Bridges
  • Post-Tensioning – Bridges

KILMANY RAIL BRIDGE

2022-2023

Laing O’Rourke is designing and constructing the third and final stage of the project which is a 5-kilometre-long section in the Kilmany district. VSL was contracted to move a 3,400-tonne bridge into position using lateral sliding.