Klang Valley Mass Rapid Transit Line 2

2017-2020

VSL erected a 6.7km-long viaduct as part of the construction of a new railway line in Kuala Lumpur, Malaysia. The scope of work included the supply and operation of launching gantries, segment lifting frames and cranes to erect the bridge deck, together with post-tensioning works. Both a span-by-span approach and balanced cantilever construction were used to erect the precast segments.