Kwidzyn Bridge
2013
VSL supplied materials and installed the stay cable system on the Kwidzyn Bridge which crosses the Vistula River about 100km south of Gdansk. The stressing was carried out using a computer-controlled automatic stressing system that took account of the structure’s characteristics to ensure stress uniformity after the last strand was installed.