• Hong Kong, Hong Kong
  • Tunnels
  • Heavy lifting – Tunnels

Liantang / Heung Yuen Wai Boundary Control Point – Contract 2

2017

Working closely with the main contractor Dragages Hong Kong (DHK), VSL was able to carry out a challenging task of turning around a large tunnel boring machine (TBM) while still underground. VSL was responsible for the design of the movement operations, supply, installation and operation equipment, and completed the task in only eight weeks thanks to its heavy lifting expertise in the civil engineering sector.