• Puerto Berrío, Colombia
  • Bridges
  • Deck Construction – Bridges
  • Post-Tensioning – Bridges

Magdalena River Bridge

2019-2020

VSL supplied three pairs of form travellers and developed construction methods to erect the deck of a new bridge crossing the River Magdalena in Puerto Berrio, Colombia. The teams also supplied and installed the VSL post-tensioning system used for the deck construction. This is one of the many bridge projects VSL has carried out across Colombia’s longest river these past two years.