Merah Putih Bridge
2015 - 2016
VSL supplied its SSI 2000e stay cable system components and performed installation, stressing and greasing of the stay cables for a 300m long cable stayed bridge with total length of about 1.1km in Ambon: it is one of the longest bridges of Eastern Indonesia.