• HANOI, Vietnam
  • Buildings
  • Post-Tensioning – Buildings

MIPEC RIVERSIDE PROPERTY DEVELOPMENT

2015

VSL installed 116,172m² of post-tensioned slabs between 265mm and 275mm thick, with two-way post-tensioned tendons, for Mipec Riverside, a luxury property development in Long Bien, a prominent district of Hanoi. The construction cycles achieved were seven to eight days per 3,600m² floor, a rhythm that helped expedite overall construction of the complex’s twin 26-storey towers.