• KRAKOW, Poland
  • Bridges
  • Post-Tensioning – Bridges
  • Stay Cables – Bridges

NEW KRAKOW TRAMWAY

2015

VSL provided post-tensioning and stay cables works for two viaducts of 461m and 141m long each, as part of a new tramway junction to improve traffic flow in Krakow. VSL modified the pylon concept to incorporate VSL Saddles and provided technical assistance in designing optimisation of the construction techniques, costs and final appearance of the structure.