NGUYEN VAN TROI – TRAN THI LY BRIDGE
2011 – 2013
VSL carried out structural monitoring during the construction of Nguyen Van Troi –Tran Thi Ly Bridge, a 430m long cable stayed bridge with a 230m-long main span in Da Nang. VSL configured and operated a bespoke system and the associated software to enable the collection of data during construction, reporting on stresses and temperatures in the concrete structure, stay cable forces and vibration in real time, and providing warnings and alerts whenever necessary. VSL also carried out the supply and installation of 63 stay cables.