PARKER POINT FUEL
2015
VSL carried out the external post-tensioning works including strand installation, stressing and grouting to reinforce the concrete ring beam bases of two diesel tanks at Parker Point Fuel Terminal in Dampier, Australia. VSL designed, procured and installed Z-type anchorages consisting of 20 strands for the first time in Australia for this project.