PIKES CREEK BRIDGE
2018
As part of structural upgrades to accommodate higher traffic loads, the strengthening of the Pykes Creek Bridge involved the supply and installation of steel braces for crosshead reinforcement, and external post-tensioning works. It included a number of critical tasks such as the scanning and coring of the bridge deck, and the grouting of additional steel bracing to the headstocks.