• , Czech Republic
  • Bridges
  • Deck Construction – Bridges
  • Post-Tensioning – Bridges

Rybny Potok Bridge

2005

To construct the D8 highway bridge over the Rybný Potok Valley, VSL provided the launching system as well as carrying out all the post-tensioning work and supplying the temporary bearings for launching.