Rybny Potok Bridge
2005
To construct the D8 highway bridge over the Rybný Potok Valley, VSL provided the launching system as well as carrying out all the post-tensioning work and supplying the temporary bearings for launching.
To construct the D8 highway bridge over the Rybný Potok Valley, VSL provided the launching system as well as carrying out all the post-tensioning work and supplying the temporary bearings for launching.