S3 LEGNICA – LUBAWKA BRIDGES (WS-40 AND WS-47)
2021-2022
VSL supplied and installed the post-tensioning system and the incremental launching equipment for two bridges (each with two lanes) using VSL’s incremental launching method (ILM), for the section of S3 Legnica (A4) – Lubawka, Poland.