TEMBURONG BRIDGE – CONTRACT CC3
2016 – 2019
VSL designed, supplied and supervised the installation of stay-cables together with a saddle system for an iconic new two tower-cable-stayed bridge in Muara, Brunei. The saddle allowed the pylon dimensions to be optimised and reduced material costs and maintenance access requirements. The project also included stay-cable protection: fire protection, rubber dampers to avoid stay-cable vibrations and an anti-vandalism solution.