TUEN MUN – CHEK LAP KOK LINK – NORTHERN CONNECTION SUBSEA TUNNEL SECTION
2014 -2017
VSL carried out lifting and lowering of Tunnel Boring Machines (TBMs) with over 100 heavy-lift operations, including one of the largest in the world at 17.6m in diameter, to help build the subsea tunnel section of the Tuen Mun – Chek Lap Kok Link – Northern Connection in Hong Kong.