• TUNIS, Tunisia
  • Bridges
  • Deck Construction – Bridges
  • Post-Tensioning – Bridges

Tunis Rapid Rail Network

2012 – 2017

Keeping disruption to road and railway traffic to an absolute minimum, VSL was a key part in providing technical assistance and equipment, to assist successful prefabrication and installation of bridge segments span-by-span on the Réseau Ferroviaire Rapide rail project in Tunis.