Tunnel Boring Machine, Biel
2011
A new road was built, connecting with the A5 Autobahn, comprising of several tunnels being built within a very short distance. VSL Heavy Lifting slid the 2,500t tunnel boring machine over 625m.
A new road was built, connecting with the A5 Autobahn, comprising of several tunnels being built within a very short distance. VSL Heavy Lifting slid the 2,500t tunnel boring machine over 625m.