• Penang, Malaysia
  • Buildings
  • Post-Tensioning – Buildings

UCT Factory

2022

Savings of more than 20% in construction cost and 30% in construction time were achieved with VSL’s post-tensioning solution for a factory extension in Malaysia.

  • Low-Carbon Solution