FABLOVKA CABLE-STAYED BRIDGE
2023-2025
The Fablovka cable-stayed bridge, part of the North-East Pardubice Ring Road, crosses the Labe (Elbe) River east of Prague. VSL Czech Republic delivered deck erection, post-tensioning, and stay cable design and installation. The bridge was built using incremental launching, an efficient method for structures with repetitive spans, enabling standardised construction and controlled execution. In 2025, it is the longest cable-stayed bridge in the Czech Republic.