750M & 530M LAND TO SEA HDD OUTFALL

2011-2012

The Hong Kong Government Drainage Services Department was constructing two new sewage treatment plants on Lamma Island that necessitated the installation of submarine outfalls. Intrafor was contracted to install the outfall pipes; two holes were drilled by HDD methods of 750m & 530m in length and a maximum diameter of 600mm.