Nowy Korczyn Bypass

2025

VSL carried out incremental launching and post-tensioning works for the new bridge over the Nida River, a key element of the Nowy Korczyn Bypass. The 209-metre-long bridge was launched in eleven stages, requiring precise control of geometry, stability and deflection, and was completed on schedule within a six-month construction period.