Bridge deck erection is often the most impressive work in the scope of a bridge construction project. It can be erected using various methods – all depending on the design specifications of the project, as well as the specific environment and access requirements. These methods can be:

  • Span-by-span erection
  • Balanced cantilever erection
  • Incremental launching methods
  • Heavy lifting

Depending on the project’s constraints, the spans can be constructed by utilising either cast-in-situ technology or by using prefabricated spans. Regardless, the overall aim is to guarantee safety and to speed up production and erection – to ensure financial savings and adherence to project timelines.

Buidling these complex or major structures also requires specialized formwork that addresses specific needs or requirements such as complexity and shape, size or volume, or work of a repetitive nature, requiring for short construction cycles.

How VSL can help you

With over 60 years of experience and many iconic references, VSL is a world leader in deck erection – specifically in precast segmental erection and heavy lifting.

We leverage a 3-pillar approach to offer you a 360° solution by combining:

  • Engineering assistance to consultants in order to define the best-suited method of construction, cycles, and the overall project schedule to best optimise budgets,
  • Specialist deck erection equipment and methods,
  • Sound operational skills for project execution.

In addition, VSL has considerable experience in the design, supply, commissioning and operation of a wide variety of specialized form systems, including:

  • Precast beams, piers and crossheads,
  • Precast segments that are match-cast and post-tensioned,
  • Precasting of full spans for long, straight and repetitive structures,
  • Prefabricated bridge piers ready for assembly in the field,
  • Special formwork for bridge pylons, especially for cable-stayed structures,
  • Modular form-traveller systems to cast segments in situ,
  • Movable scaffold support systems to cast full spans in situ.
Melbourne, Australia – When constraints drive creativity (2017)

What are the VSL deck construction solutions?

A design & build package:

  • Design, manufacturing and commissioning of heavy construction equipment and temporary structures, including launching nose, heavy lifting equipment and formworks.
  • Project management, including engineering for temporary works and the design and operation of precasting yard.
  • Project execution.

 

    Do you have a project in mind?

    Get in touch now!


    (Format Doc, Docx, Ppt, Pptx, Xls, Xlsx, pdf.
    Step up to 10M for 4 files)



    I agree that the data I provide by filling out this form can be used by VSL:


    VSL, as a Data Controller, uses your data in compliance with applicable laws and regulations on personal data protection. You can withdraw your consent at any time : see information here. You have the right to access and rectify inaccurate data about you and, in cases provided for in the regulations, to object to the storage of certain personal data and have such data deleted, to restrict the processing of data and to request portability enabling transfer to a third party. Find out all information in our Privacy Policy.